About

As part of the Victorian Government’s Level Crossing Removal Project (LXRP):

Project description

Level crossing removals – Beaconsfield

LXRP is building a new road bridge over the rail line at Brunt Road and Station Street in Beaconsfield. The 2 level crossings in Beaconsfield will be removed by constructing new road bridges over the rail line. Designs have been released for these new bridges. You can view these designs on Victoria’s Big Build website

Early works are underway at Brunt Road, Beaconsfield and construction will be completed by 2025.

Site investigations are underway at Station Street, Beaconsfield and construction will be completed by 2025.

Visit Victoria’s Big Build project pages to view information including:

  • info about each project
  • current works notices and disruptions
  • how to sign up for email updates
  • engagement opportunities
  • contact information if you have questions about a project
  • image galleries

Brunt Road Beaconsfield   Station Street Beaconsfield

Enquiries and updates

Funding

Council is a key stakeholder in Level Crossing Removal Project. We’ll work with the LXRP, and advocate to the Victorian Government for the project to:

  • improve support and enhance opportunities for existing and future businesses
  • integrate the train station, bus interchange and car parking with the town centre and surrounding communities, and improve pedestrian paths
  • provide safe and functional community spaces
  • enhance the look of the area, including by landscaping through the precinct
  • improve traffic flow, including integrating the existing paths with new pedestrian and bicycle connections
  • minimise disruption to local businesses and our wider community during construction.

 

Construction construction-icon
Project Highlights
  • Station Street, Beaconsfield level crossing to be removed by 2025