Sealing the Hills is a vital infrastructure program which aims to upgrade currently unsealed roads in the Dandenong Ranges and surrounding townships.
Unsealed roads are heavily impacted by weather conditions, land formations and increased traffic, particularly in the Dandenong Ranges.
Upgrading these unsealed roads will improve community safety, access to community facilities and amenities and the connectivity of the existing road network, while reducing dust, pollution and maintenance issues.
Project description
Stage 2 of the First-Grenville package includes Second Avenue and the ROWY, Cockatoo.
Works include:
- feature pavement construction
- kerb channel construction
- construction of traffic calming devices
- drainage improvement works
- signage
- line-marking
Other stages
Stage 1 works will take place on First Avenue, Grenville Road, Spring Street and Hazel Street, Cockatoo.
Stage 3 works will take place on Neville Street, Steane Street and Marcelle Street, Cockatoo.
Funding
This project is jointly funded by the Australian Government and contributions by residents via a Special Charge Scheme.
Progress update
Upgrade sealing works on Stage 2 is underway and works are expected to be completed by July 2025.
The contractor for these works is Sure Constructions.
Have your say on the First-Grenville package
Updates
- Pavement works and base layer works are underway
- Driveways works underway
Sure Constructions are currently working closely with Council to redesign sections of Second Avenue, Cockatoo to deliver a quality final product. Redesigns were required to help rectify existing drainage works and alignment. Updated plans are expected to be approved within the coming weeks, after which the contractor will be back onsite to resume works.
Project Highlights
- Redesigns are currently underway on sections of Second Ave
- Construction is expected to completed by July 2025, conditions permitting.