The Princes Highway Intersections project will transform local roads to cope with future growth and to improve travel for generations to come. 

 

This key infrastructure project will provide safer travel for all road users, while improving connectivity and access along this vital growth corridor. These intersection upgrades are expected to reduce congestion and improve travel time reliability along this corridor. 

 

Princes Hwy intersection FAQs

Project description

The intersection upgrade will include:

  • upgrading to fully signalised crossroad intersection
  • a westbound bus priority lane
  • construction of new Bayview Road South leg connecting intersection to Pioneer Way
  • Bayview Road north leg road realignment
  • dual right turn lanes into Bayview Road
  • left turn slip lanes into Bayview Road
  • cyclist and pedestrian facilities with dedicated bicycle lane signalisation
  • path connections
  • improved drainage
  • landscaping

 

Funding

Bayview Rd intersection is jointly funded by Developer Contributions and the Australian Government.

 

The Princes Highway Intersection program has $36 million in funding to deliver 8 major intersection upgrades from 2020 to 2029.

  • Australian Government contribution: $17.8 million from its Urban Congestion Fund.
  • Council contribution: $18.3 million from its Developer Contribution Plan.

 

Progress update

Ongoing works
  • Majority of the civil works have been completed on the Bayview Rd intersection.
  • Minor concrete and tidy up works are continuing.
  • Traffic signals are expected to be powered up and turned on by April 2024.
  • Landscaping works will take place after Summer.
  • Works are continuing on the Tivendale Rd intersection.

 

Disruptions & closures
  • To ensure public safety, the median crossing will remain closed for the duration of works. Drivers will be unable to turn right in or right out of Bayview Rd.
  • Southern connection to Pioneer Way will be opened once the traffic signals are turned on in April 2024.
  • Traffic management will be in place and delays are expected in the area.

Please obey all signs and instructions from traffic management staff, to keep all drivers, pedestrians, and contractors safe.

Construction construction-icon
Project Highlights
  • Majority of works are completed
  • Tidy-up works are continuing.
  • Traffic signals are expected to be turned on by April 2024.
  • Traffic management will remain in place until traffic lights are turned on
  • Southern connection to Pioneer Way to be opened once traffic signals are turned on
  • Landscaping works to start after Summer